MEC-Aging Inspection | 12/16/2003 | 12/16/2003 | 12/16/2003 | | PASS |
Dixie Fellows
|
|
|
finaled by structural 12/19/2003 3:58:50 PM
|
Final | 9/16/2003 | 9/17/2003 | 9/17/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/16/2003 at 1:44:15 PM. Contact: ###-####.... 9/17/2003 9:31:57 AM called cont..unable to wait for him to get here from caldwell..will reschedule 9/17/2003 9:32:57 AM
|
Final | 9/12/2003 | 9/15/2003 | 9/15/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/12/2003 at 2:18:50 PM. Contact: ###-####. remove tiles and provide ladder for access to equipment 9/15/2003 8:56:29 AM
|
Rough-in | 9/8/2003 | 9/8/2003 | 9/8/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/8/2003 at 9:15:40 AM. Contact: ###-####. secondary lines to be separate from main condensate line 9/9/2003 10:05:11 AM
|
Rough-in | 9/2/2003 | 9/3/2003 | 9/3/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/2/2003 at 2:57:58 PM. Contact: ###-####. talked to ponch 9/3/2003 9:52:33 AM
|