Final | 10/15/2003 | 10/16/2003 | 10/16/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/15/2003 at 4:52:12 PM. Contact: ###-####.
|
Pressure Test | 8/25/2003 | 8/25/2003 | 8/25/2003 | P | DONE |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 8/25/2003 at 9:50:07 AM. Contact: ###-####.
|
Pressure Test | 8/22/2003 | 8/22/2003 | 8/22/2003 | P | PASS |
Alan Hauser
|
|
|
tamarra; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
Rough-in | 8/22/2003 | 8/22/2003 | 8/22/2003 | P | PASS |
Alan Hauser
|
|
|
tamarra; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|