Final | 9/25/2003 | 9/26/2003 | 9/26/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/25/2003 at 9:52:58 AM. Contact: ###-####.
|
Final | 9/24/2003 | 9/25/2003 | 9/25/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/24/2003 at 8:21:05 AM. Contact: ###-####. prv to close to wall at w/h 9/25/2003 9:41:07 AM
|
Pressure Test | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 1:03:01 PM. Contact: ###-####. r/i and gas ok 9/2/2003 9:45:46 AM
|
Rough-in | 8/28/2003 | 8/28/2003 | 8/28/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/28/2003 at 9:05:40 AM. Contact: ###-####. NO SUCH ADDRESS POSTED 8/28/2003 4:32:05 PM
|