Final | 5/4/2004 | 5/4/2004 | 5/4/2004 | A | PASS |
Alan Hauser
|
|
|
Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
|
Final | 3/16/2004 | 3/17/2004 | 3/17/2004 | A | FAIL |
Dave Lightfoot
|
|
|
Phone #: ###-#### Internet Inspection Request from: RaChelle Meister need permit 3/17/2004 9:59:11 AM
|
Final | 3/15/2004 | 3/16/2004 | 3/16/2004 | A | CANC |
Dave Lightfoot
|
|
|
Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
|
Rough-in | 1/20/2004 | 1/20/2004 | 1/20/2004 | A | PASS |
Alan Hauser
|
|
|
ROUGH IN 4TH & 5TH FLOORS. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
|
Final | 1/8/2004 | 1/8/2004 | 1/8/2004 | P | PART |
Alan Hauser
|
|
|
PLEASE FINAL SHELL & CORE. THANKS.; signed temporary occ., waiting for the final air balance report. all else ok 1/8/2004 3:01:02 PM
|
Final | 1/5/2004 | 1/6/2004 | 1/6/2004 | A | PART |
Alan Hauser
|
|
|
3rd floor final, signed card in electrical room 1/6/2004 11:25:33 AM
|
Final | 1/5/2004 | 1/6/2004 | 1/6/2004 | A | PART |
Alan Hauser
|
|
|
3rd floor final, signed card in electrical room 1/6/2004 11:25:33 AM
|
Final | 1/5/2004 | 1/5/2004 | 1/5/2004 | P | NR |
Alan Hauser
|
|
|
c;/n at office in bldg 1/5/2004 2:59:52 PM
|
Rough-in | 12/16/2003 | 12/16/2003 | 12/16/2003 | P | PART |
Alan Hauser
|
|
|
third floor ok for tile, duct smoke detectors to be in supply air at all heat pumps 12/16/2003 3:13:25 PM
|
Rough-in | 11/12/2003 | 11/12/2003 | 11/12/2003 | A | PART |
Alan Hauser
|
|
|
shafts and hard ceiling areas ok on 2 and 3 11/12/2003 2:51:45 PM
|
Rough-in | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | PART |
Alan Hauser
|
|
|
|