Final | 8/28/2003 | 8/29/2003 | 8/29/2003 | A | PASS |
Dixie Fellows
|
|
|
jerry; Phone #: ###-#### Internet Inspection Request from: Annette Moore..metal duct in crawl is insulated as well as boots 8/29/2003 9:18:43 AM
|
Rough-in | 8/26/2003 | 8/27/2003 | 8/27/2003 | A | FAIL |
Dixie Fellows
|
|
|
JERRY; Phone #: ###-#### Internet Inspection Request from: Marc Lileks insulate all metal in crawl with r-5..bath exhausts to be class 1 duct 8/27/2003 11:02:30 AM
|