Final | 12/17/2003 | 12/18/2003 | 12/18/2003 | P | CANC |
Tom Arcoraci
|
|
|
Joe ###-#### 12/18/2003 4:35:48 PM
|
Final | 12/18/2003 | 12/18/2003 | 12/18/2003 | A | PASS |
Dixie Fellows
|
|
|
no mantle installed at f/p at time of final 12/19/2003 9:14:36 AM
|
Rough-in | 10/27/2003 | 10/27/2003 | 10/27/2003 | P | PASS |
Dixie Fellows
|
|
|
Comb. air; Phone #: ###-#### Internet Inspection Request from: Matt Hansen comb air to attic equipment 10" ok 10/27/2003 2:57:58 PM
|
Pressure Test | 10/13/2003 | 10/14/2003 | 10/14/2003 | A | PASS |
Dixie Fellows
|
|
|
Thank you!; Phone #: ###-#### Internet Inspection Request from: Matt Hansen re-tagged 60.b and 20lb test ok 10/14/2003 10:09:48 AM
|
Pressure Test | 9/19/2003 | 9/22/2003 | 9/22/2003 | A | PASS |
Dixie Fellows
|
|
|
60lb test to w/h ok 9/22/2003 9:55:28 AM
|
Pressure Test | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Matt Hansen entrance blocked...pouring concrete..rescheduled for monday 9/19/2003 4:48:27 PM
|
Rough-in | 9/18/2003 | 9/19/2003 | 9/19/2003 | A | PART |
Dixie Fellows
|
|
|
per your request ###-#### re-test 60lb test..20lb test ok 9/19/2003 8:37:39 AM
|
Rough-in | 9/17/2003 | 9/18/2003 | 9/18/2003 | A | NR |
Dixie Fellows
|
|
|
2 Furn.- 80,000
2 Furn.- 100,000
Water heater- 45,000
Fire Place- 25,000
Total- 430,000; Phone #: ###-#### Internet Inspection Request from: Matt Hansen...###-#### 9/18/2003 8:11:00 AM...90' 9/18/2003 8:14:34 AM..###-#### 9/18/2003 2:24:22 PM
|
Rough-in | 9/16/2003 | 9/17/2003 | 9/17/2003 | A | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Matt Hansen r/i ok...need btu load for gas pipe sizing 9/17/2003 8:57:37 AM
|
Rough-in | 9/11/2003 | 9/12/2003 | 9/12/2003 | A | CANC |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Matt Hansen
|
Rough-in | 9/12/2003 | 9/12/2003 | 9/12/2003 | P | NR |
Alan Hauser
|
|
|
going to meet with contractor on monday the 15, at 9 am 9/12/2003 3:07:01 PM
|