Final | 11/17/2003 | 11/19/2003 | 11/19/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/17/2003 at 3:11:53 PM. Contact: ###-####.
|
Final | 11/13/2003 | 11/18/2003 | 11/17/2003 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/13/2003 at 3:47:22 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Nov 17 2003 3:11PM.
|
Rough-in | 9/11/2003 | 9/16/2003 | 9/16/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/11/2003 at 3:47:19 PM. Contact: ###-####. received approved specs from engineer for this application 9/16/2003 10:18:33 AM
|