Final | 11/14/2003 | 11/14/2003 | 11/14/2003 | P | PASS |
Jim Storey
|
|
|
###-#### tamura
|
Rough-in | 9/23/2003 | 9/23/2003 | 9/23/2003 | P | PASS |
Dave Lightfoot
|
|
|
chris- ###-####
|
Rough-in | 9/22/2003 | 9/22/2003 | 9/22/2003 | P | FAIL |
Alan Hauser
|
|
|
no inspections till fee paid 9/22/2003 2:31:31 PM
|
Rough-in | 9/19/2003 | 9/22/2003 | 9/19/2003 | A | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/19/2003 at 10:47:02 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Sep 19 2003 11:07AM.
|
Pressure Test | 9/18/2003 | 9/19/2003 | 9/19/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/18/2003 at 5:32:52 PM. Contact: ###-####.
|
Rough-in | 9/18/2003 | 9/19/2003 | 9/19/2003 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/18/2003 at 5:32:37 PM. Contact: ###-####.
|
Rough-in | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/19/2003 at 11:08:42 AM. Contact: ###-####. c/n on flue not corected to meet code. 9/19/2003 12:21:10 PM
|