Final | 10/23/2003 | 10/24/2003 | 10/24/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/23/2003 at 1:41:17 PM. Contact: ###-####.
|
Pressure Test | 10/7/2003 | 10/8/2003 | 10/8/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/7/2003 at 11:47:17 AM. Contact: ###-####. this should be a final...called cont 10/8/2003 8:45:51 AM
|
Pressure Test | 9/17/2003 | 9/18/2003 | 9/18/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/17/2003 at 2:15:01 PM. Contact: ###-####. both 60lb tests to equip on roof ok 9/18/2003 3:30:37 PM
|
Pressure Test | 9/16/2003 | 9/17/2003 | 9/17/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/16/2003 at 9:42:35 AM. Contact: ###-####. 60lb test on 48lb 9/17/2003 11:41:08 AM
|