Final | 12/5/2003 | 12/5/2003 | 12/5/2003 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Evans
|
Final | 12/3/2003 | 12/4/2003 | 12/4/2003 | A | FAIL |
Dixie Fellows
|
|
|
call 30 minutes ahead for access; Phone #: ###-#### Internet Inspection Request from: Michelle Evans..off orchard 12/4/2003 8:17:13 AM provide 30"x30" passage to front of furnace..need disconnect...outlet..30" working space in front of furnace...washer/dryer being removed from garage after homeowner was told they needed to be 18" above source of ignition 12/4/2003 9:04:15 AM
|
Final | 11/20/2003 | 11/20/2003 | 11/20/2003 | P | FAIL |
Dixie Fellows
|
|
|
door is open - if you have problems call Chris @ ###-####; Phone #: ###-#### Internet Inspection Request from: Michelle Evans
|
Rough-in | 11/20/2003 | 11/20/2003 | 11/20/2003 | P | FAIL |
Dixie Fellows
|
|
|
door is open - if you have problems call Chris @ ###-####; Phone #: ###-#### Internet Inspection Request from: Michelle Evans where is access to crawl?? 11/20/2003 4:06:53 PM
|
Rough-in | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | PASS |
Dixie Fellows
|
|
|
CALL BEFORE GOING OUT ###-#### CHRIS; Phone #: ###-#### Internet Inspection Request from: Michelle Evans
|
Rough-in | 9/29/2003 | 9/30/2003 | 9/30/2003 | A | PART |
Dixie Fellows
|
|
|
CALL FOR WALK-THRU WITH CHRIS ###-####; Phone #: ###-#### Internet Inspection Request from: Michelle Evans conference with tml...discussed corrections 9/30/2003 8:33:11 AM
|
Rough-in | 9/29/2003 | 9/29/2003 | 9/29/2003 | P | FAIL |
Dixie Fellows
|
|
|
CALL CHRIS FOR ACCESS INFO ###-####; Phone #: ###-#### Internet Inspection Request from: Michelle Evans called chris for a walk-through 9/29/2003 12:41:34 PM
|
Rough-in | 9/24/2003 | 9/25/2003 | 9/25/2003 | A | NR |
Dixie Fellows
|
|
|
call for access info ###-#### chris; Phone #: ###-#### Internet Inspection Request from: Michelle Evans waiting on flue for w/h...arriving next week 9/25/2003 9:30:43 AM
|
Final | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Evans corrections not done..reinspection fee 9/19/2003 1:28:00 PM
|
Final | 9/18/2003 | 9/19/2003 | 9/19/2003 | A | FAIL |
Russ Owen
|
|
|
c/n posted. 9/18/2003 6:56:40 PM
|
Pressure Test | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Evans
|
Pressure Test | 9/18/2003 | 9/19/2003 | 9/19/2003 | A | PASS |
Russ Owen
|
|
|
left over see note under prior request. 9/18/2003 12:39:47 AM
|
Final | 9/16/2003 | 9/18/2003 | 9/18/2003 | P | CANC |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Evansout of time cloned 9/18/2003 12:40:59 AM
|
Pressure Test | 9/16/2003 | 9/18/2003 | 9/18/2003 | P | CANC |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Evans out of time.cloned 9/18/2003 12:40:53 AM
|