Final | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | CANC |
Dave Lightfoot
|
|
|
there should be a key above the front door; Phone #: ###-#### Internet Inspection Request from: misty evans Inspection cancelled from web by: misty evans
|
Final | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | CANC |
Dave Lightfoot
|
|
|
there should be a key above the front door; Phone #: ###-#### Internet Inspection Request from: misty evans
|
Final | 11/21/2003 | 11/21/2003 | 11/21/2003 | P | PASS |
Dixie Fellows
|
|
|
There should be a key above the front door; Phone #: ###-#### Internet Inspection Request from: misty evans the doors to the furn/wh enclosure have been removed at fina; 11/21/2003 2:00:57 PM
|
Final | 11/18/2003 | 11/19/2003 | 11/19/2003 | A | FAIL |
Dave Lightfoot
|
|
|
there is a key above the front door; Phone #: ###-#### Internet Inspection Request from: misty evans
|
Final | 11/17/2003 | 11/18/2003 | 11/18/2003 | A | NH |
Dave Lightfoot
|
|
|
There is a key in the receptacle by the front door; Phone #: ###-#### Internet Inspection Request from: misty evans no key 11/18/2003 11:21:46 AM
|
Final | 11/5/2003 | 11/6/2003 | 11/6/2003 | A | NR |
Alan Hauser
|
|
|
finish water heater and get proper clearances at flue connector, reinspection fee, no inspections till paid 11/6/2003 12:12:08 PM
|
Final | 11/5/2003 | 11/5/2003 | 11/5/2003 | P | CANC |
Russ Owen
|
|
|
There should be a key in the receptacle by the door.; Phone #: ###-#### Internet Inspection Request from: misty evansout of time 11/6/2003 1:18:24 PM
|
Final | 11/5/2003 | 11/5/2003 | 11/5/2003 | P | CANC |
Russ Owen
|
|
|
There should be a key in the receptacle by the door.; Phone #: ###-#### Internet Inspection Request from: misty evans . out of time recalled. 11/5/2003 12:48:55 AM
|
Final | 11/4/2003 | 11/4/2003 | 11/4/2003 | P | FAIL |
Russ Owen
|
|
|
There should be a key in the receptacle by the door; Phone #: ###-#### Internet Inspection Request from: misty evans c/n posted. 11/3/2003 11:26:01 PM
|
Pressure Test | 9/22/2003 | 9/23/2003 | 9/23/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 4:01:30 PM. Contact: ###-####.
|
Rough-in | 9/22/2003 | 9/23/2003 | 9/23/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 4:01:21 PM. Contact: ###-####.
|
Pressure Test | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/19/2003 at 9:57:30 AM. Contact: ###-####.
|
Rough-in | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/19/2003 at 9:57:23 AM. Contact: ###-####.
|