Final | 12/11/2003 | 12/11/2003 | 12/11/2003 | P | PASS |
Dixie Fellows
|
|
|
Greg; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Final | 12/5/2003 | 12/8/2003 | 12/8/2003 | A | FAIL |
Dixie Fellows
|
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes NEED PROTECTION POST 12/8/2003 10:25:34 AM
|
Pressure Test | 9/23/2003 | 9/24/2003 | 9/24/2003 | P | PASS |
Dixie Fellows
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Rough-in | 9/23/2003 | 9/24/2003 | 9/24/2003 | P | PASS |
Dixie Fellows
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|