Final | 12/23/2003 | 12/24/2003 | 12/24/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/23/2003 at 11:50:20 AM. Contact: ###-####.
|
Rough-in | 11/24/2003 | 11/25/2003 | 11/25/2003 | A | PASS |
Dixie Fellows
|
|
|
TML INSTALLER ON SITE; Phone #: ###-#### Internet Inspection Request from: Michelle Evans all ducts after fir down ok in all units 11/25/2003 8:33:02 AM
|
Rough-in | 11/21/2003 | 11/24/2003 | 11/24/2003 | P | NR |
Dixie Fellows
|
|
|
EARLY IF POSSIBLE TML INSTALLER ON SITE; Phone #: ###-#### Internet Inspection Request from: Michelle Evans unable to meet with rob 11/24/2003 3:53:14 PM
|