Final | 7/1/2004 | 7/1/2004 | 7/1/2004 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 7/1/2004 at 8:39:48 AM. Contact: ###-####.
|
Pressure Test | 6/16/2004 | 6/16/2004 | 6/16/2004 | P | PASS |
Alan Hauser
|
|
|
this test is for the shop bldg 6/16/2004 4:20:56 PM
|
MEC-Aging Inspection | 4/22/2004 | 4/22/2004 | 4/22/2004 | | FAIL |
Alan Hauser
|
|
|
|
MEC-Aging Inspection | 2/19/2004 | 2/19/2004 | 2/19/2004 | | CANC |
Alan Hauser
|
|
|
|
MEC-Aging Inspection | 12/16/2003 | 12/16/2003 | 12/16/2003 | | PART |
Alan Hauser
|
|
|
|
Pressure Test | 10/8/2003 | 10/9/2003 | 10/9/2003 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/8/2003 at 4:08:59 PM. Contact: ###-####.
|
Pressure Test | 10/9/2003 | 10/9/2003 | 10/9/2003 | P | PART |
Alan Hauser
|
|
|
holding pressure, but have been ask to move riser at out building, ok to cover except at new riser location 10/9/2003 6:07:11 PM
|