Final | 11/12/2003 | 11/13/2003 | 11/13/2003 | P | PASS |
Dixie Fellows
|
|
|
###-#### lindsey
|
Final | 11/11/2003 | 11/12/2003 | 11/12/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/11/2003 at 11:54:04 AM. Contact: ###-####.
|
Final | 10/30/2003 | 11/3/2003 | 11/3/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/30/2003 at 8:28:00 AM. Contact: ###-####. protection post needs to be in front of equipment 11/3/2003 10:30:41 AM
|
Rough-in | 10/9/2003 | 10/10/2003 | 10/10/2003 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/9/2003 at 12:45:56 PM. Contact: ###-####.
|
Rough-in | 10/10/2003 | 10/10/2003 | 10/10/2003 | P | PASS |
Jim Sly
|
|
|
|
Pressure Test | 10/9/2003 | 10/9/2003 | 10/9/2003 | A | PASS |
Tom Arcoraci
|
|
|
|
Rough-in | 10/8/2003 | 10/9/2003 | 10/9/2003 | A | FAIL |
Tom Arcoraci
|
|
|
lindsey; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|