DOC - Permit Finaled | | | 8/17/2004 | | DONE |
|
|
|
|
Final | 12/12/2003 | 12/12/2003 | 12/12/2003 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/12/2003 at 8:02:05 AM. Contact: ###-####.
|
Pressure Test | 10/14/2003 | 10/15/2003 | 10/15/2003 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/14/2003 at 2:55:58 PM. Contact: ###-####.
|
Pressure Test | 10/15/2003 | 10/15/2003 | 10/15/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/15/2003 at 9:24:49 AM. Contact: ###-####.
|
Rough-in | 10/14/2003 | 10/15/2003 | 10/15/2003 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/14/2003 at 2:54:14 PM. Contact: ###-####.
|