DOC - Permit Finaled | | | 8/13/2004 | | DONE |
|
|
|
|
Final | 11/13/2003 | 11/17/2003 | 11/17/2003 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/13/2003 at 8:37:21 AM. Contact: ###-####.
|
Pressure Test | 10/21/2003 | 10/22/2003 | 10/22/2003 | A | FAIL |
Russ Owen
|
|
|
|
Rough-in | 10/22/2003 | 10/22/2003 | 10/22/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/22/2003 at 11:27:47 AM. Contact: ###-####.
|
Rough-in | 10/21/2003 | 10/22/2003 | 10/22/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/21/2003 at 9:01:11 AM. Contact: ###-####.
|