Final | 12/18/2003 | 12/19/2003 | 12/19/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/18/2003 at 3:42:06 PM. Contact: ###-####. c/n made ok 12/19/2003 9:00:33 AM
|
Final | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/17/2003 at 11:36:00 AM. Contact: ###-####. Condensate line needs clearance to earth at ext grade. prior c/n.12/18/2003 11:51:42 AM 12/18/2003 11:51:53 AM
|
Pressure Test | 10/27/2003 | 10/28/2003 | 10/28/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/27/2003 at 5:05:06 PM. Contact: ###-####.
|
Rough-in | 10/27/2003 | 10/28/2003 | 10/28/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/27/2003 at 5:04:47 PM. Contact: ###-####.
|