DOC - Permit Finaled | | | 8/13/2004 | | DONE |
|
|
|
|
Final | 12/2/2003 | 12/3/2003 | 12/3/2003 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/2/2003 at 3:25:16 PM. Contact: ###-####.
|
Final | 11/26/2003 | 12/1/2003 | 12/1/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/26/2003 at 8:00:52 AM. Contact: ###-####. foil back insulation falling off metal ductwork 12/1/2003 9:20:20 AM
|
Pressure Test | 11/3/2003 | 11/4/2003 | 11/4/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/3/2003 at 7:57:45 AM. Contact: ###-####.
|
Rough-in | 11/3/2003 | 11/4/2003 | 11/4/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/3/2003 at 7:57:29 AM. Contact: ###-####.
|