Final | 1/7/2004 | 1/7/2004 | 1/7/2004 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England
|
Rough-in | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | PASS |
Dave Lightfoot
|
|
|
tml--###-####-re-insp
|
Rough-in | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | PASS |
Dave Lightfoot
|
|
|
tml--###-####-re-insp
|
Rough-in | 11/18/2003 | 11/19/2003 | 11/19/2003 | A | NR |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/18/2003 at 2:51:39 PM. Contact: ###-####. reinspection fee 11/19/2003 10:51:09 AM
|
Pressure Test | 11/17/2003 | 11/17/2003 | 11/17/2003 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/17/2003 at 10:30:18 AM. Contact: ###-####.
|
Rough-in | 11/17/2003 | 11/17/2003 | 11/17/2003 | P | NR |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/17/2003 at 10:30:01 AM. Contact: ###-####.
|