Final | 11/13/2003 | 11/13/2003 | 11/13/2003 | A | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 11/12/2003 | 11/13/2003 | 11/13/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/12/2003 at 4:55:57 PM. Contact: ###-####.
|
Pressure Test | 11/10/2003 | 11/12/2003 | 11/12/2003 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/10/2003 at 9:47:38 PM. Contact: ###-####. this is a high pressure system gage only at 30 psi 11/12/2003 2:40:08 PM
|
Pressure Test | 11/10/2003 | 11/10/2003 | 11/10/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/10/2003 at 10:09:57 AM. Contact: ###-####. leaking..double valve when testing against live gas line..install regulators before final 11/10/2003 1:01:01 PM
|