Rough-in | 10/14/2005 | 10/14/2005 | 10/14/2005 | P | PASS |
Troy James
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles checked fireplace clearances
|
Pressure Test | 9/23/2005 | 9/23/2005 | 9/23/2005 | P | PASS |
Troy James
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles inspected the rest of the gas piping and test
|
Rough-in | 8/21/2005 | 8/22/2005 | 8/22/2005 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 8/21/2005 at 11:26:12 PM. Contact: ###-####. duct ok, still need to finish gasline and test and call for f/p inspection on two f/p
|
Pressure Test | 1/21/2005 | 1/21/2005 | 1/21/2005 | P | PASS |
Dixie Fellows
|
|
|
as late as possible please///anthony; Phone #: ###-#### Internet Inspection Request from: Barbara Moore tested main line through garage so they could sheet-rock 1/21/2005 2:24:39 PM
|
Rough-in | 1/21/2005 | 1/21/2005 | 1/21/2005 | P | PART |
Dixie Fellows
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Jan Rice line sets through garage to outside ok 1/21/2005 2:24:57 PM
|
Mec-Request for Extension | 8/10/2004 | 8/11/2004 | 8/11/2004 | | DONE |
Jim Sly
|
|
|
OK for Ext. No contact #. 8/10/2004 4:19:32 PM
|
Rough-in | 11/26/2003 | 11/28/2003 | 11/28/2003 | P | PASS |
Dixie Fellows
|
|
|
Hydronic inspection//Last inspection of the day please///Please call before going for inspection///scott; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 100lb test ok 11/28/2003 2:58:39 PM
|