Final | 1/22/2004 | 1/23/2004 | 1/23/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/22/2004 at 6:35:33 PM. Contact: ###-####.
|
Final | 1/21/2004 | 1/22/2004 | 1/22/2004 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/21/2004 at 3:21:20 PM. Contact: ###-####. extend b-vent 2' higher than wall within 10' 1/22/2004 9:39:54 AM
|
Rough-in | 11/25/2003 | 11/26/2003 | 11/26/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/25/2003 at 3:11:55 PM. Contact: ###-####. will extend b-vent at final 11/26/2003 11:16:22 AM
|
Rough-in | 11/24/2003 | 11/25/2003 | 11/25/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/24/2003 at 2:51:40 PM. Contact: ###-####. DOORR LOCKED 11/25/2003 2:52:11 PM
|
Rough-in | 11/21/2003 | 11/24/2003 | 11/24/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/21/2003 at 4:30:10 PM. Contact: ###-####...###-#### 11/24/2003 10:57:46 AM posted corrections 11/24/2003 11:29:02 AM
|
Pressure Test | 11/21/2003 | 11/21/2003 | 11/21/2003 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/21/2003 at 11:05:57 AM. Contact: ###-####.
|
Rough-in | 11/21/2003 | 11/21/2003 | 11/21/2003 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/21/2003 at 11:05:40 AM. Contact: ###-####.
protect gas line, provide make-up air and combustion air, gas ok 11/21/2003 1:59:27 PM
|
Pressure Test | 11/18/2003 | 11/18/2003 | 11/18/2003 | P | NH |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/18/2003 at 10:48:36 AM. Contact: ###-####.
|
Rough-in | 11/18/2003 | 11/18/2003 | 11/18/2003 | P | NH |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/18/2003 at 10:48:16 AM. Contact: ###-####.
|