Final | 10/4/2004 | 10/5/2004 | 10/5/2004 | A | PASS |
Dave Hannah
|
|
|
###-#### doug
|
Final | 3/22/2004 | 3/22/2004 | 3/22/2004 | P | FAIL |
Dave Lightfoot
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Rough-in | 12/16/2003 | 12/17/2003 | 12/17/2003 | A | PASS |
Troy James
|
|
|
JEFF IS POINT OF CONTACT, CONTRACTOR ON SIGHT; Phone #: ###-#### Internet Inspection Request from: Veronica England
inspector to verify condensate at final. 12/17/2003 11:37:22 AM
|
Pressure Test | 12/10/2003 | 12/10/2003 | 12/10/2003 | P | PASS |
Troy James
|
|
|
pressure gauge is on the bbq stub. general contractor is on sight. Jeff is point of contact ###-####; Phone #: ###-#### Internet Inspection Request from: Veronica England
|