Final | 1/16/2004 | 1/20/2004 | 1/20/2004 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/16/2004 at 11:33:31 AM. Contact: ###-####.
|
Final | 1/14/2004 | 1/15/2004 | 1/15/2004 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/14/2004 at 4:54:10 PM. Contact: ###-####. C/N 1/15/2004 11:01:15 AM C/N Need Protecton post. 1/15/2004 11:02:05 AM
|
Final | 1/8/2004 | 1/12/2004 | 1/12/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/8/2004 at 8:15:39 AM. Contact: ###-####. Need 1" clearance from B-Vent. 1/12/2004 10:13:02 AM
|
Rough-in | 12/12/2003 | 12/15/2003 | 12/15/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/12/2003 at 8:05:16 AM. Contact: ###-####. r/i and gas ok 12/15/2003 11:17:12 AM
|