Final | 1/13/2004 | 1/14/2004 | 1/14/2004 | A | PASS |
Dixie Fellows
|
|
|
re-insp david ###-####- call 1st before insp
|
Final | 1/6/2004 | 1/7/2004 | 1/7/2004 | A | FAIL |
Dixie Fellows
|
|
|
###-####- david --call 1st for access please..###-#### 1/12/2004 8:45:02 AM no access to roof...called gen cont he said it wasnt his job 1/13/2004 9:29:26 AM
|
Rough-in | 12/29/2003 | 12/29/2003 | 12/29/2003 | P | PASS |
Dixie Fellows
|
|
|
Mike ###-#### call first for access. r/i and 60lb test ok..need cfm of rtu to determine if duct detector is required 12/29/2003 1:24:44 PM
|
Rough-in | 12/24/2003 | 12/26/2003 | 12/26/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/24/2003 at 10:06:11 PM. Contact: ###-####. doors locked 12/26/2003 12:12:23 PM
|
Rough-in | 12/22/2003 | 12/23/2003 | 12/23/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/22/2003 at 4:21:03 PM. Contact: ###-####. no mech plans on site..gas test failed 12/23/2003 9:43:49 AM
|
Rough-in | 12/23/2003 | 12/23/2003 | 12/23/2003 | P | NR |
Dixie Fellows
|
|
|
amber-- ###-#### -re-insp
|
Rough-in | 12/19/2003 | 12/19/2003 | 12/19/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/19/2003 at 7:08:37 AM. Contact: ###-####. no access 12/19/2003 8:56:42 AM
|