Final | 2/25/2004 | 2/25/2004 | 2/25/2004 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/25/2004 at 9:17:48 AM. Contact: ###-####.
|
Pressure Test | 12/22/2003 | 12/22/2003 | 12/22/2003 | P | PASS |
Jim Storey
|
|
|
###-#### out of tags used old metal tag inside by furn. 12/22/2003 2:17:41 PM
|
Pressure Test | 12/18/2003 | 12/19/2003 | 12/19/2003 | A | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/18/2003 at 4:09:39 PM. Contact: ###-####.
|
Pressure Test | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | FAIL |
Alan Hauser
|
|
|
haven't started gas piping yet 12/18/2003 11:03:26 AM
|
Rough-in | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/17/2003 at 3:12:01 PM. Contact: ###-####.
|