Final | 4/26/2004 | 4/26/2004 | 4/26/2004 | P | PASS |
Tony Young
|
|
|
jack ###-####
|
Final | 3/25/2004 | 3/26/2004 | 3/26/2004 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/25/2004 at 10:49:41 PM. Contact: ###-####.
|
Rough-in | 1/5/2004 | 1/5/2004 | 1/5/2004 | A | PASS |
Troy James
|
|
|
|
Pressure Test | 12/31/2003 | 12/31/2003 | 12/31/2003 | P | PASS |
Troy James
|
|
|
Jeff ###-####
|
Pressure Test | 12/30/2003 | 12/30/2003 | 12/30/2003 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/30/2003 at 9:27:09 AM. Contact: ###-####.
c/n posted, bad gauge, stuck on 25 psi
re-inspection fee due, no hold placed 12/30/2003 4:17:51 PM
|
Pressure Test | 12/28/2003 | 12/29/2003 | 12/29/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/28/2003 at 4:48:48 PM. Contact: ###-####. gas not ready...need to re-tape foil back insulation with ul181bfx 12/29/2003 9:27:35 AM
|
Rough-in | 12/22/2003 | 12/23/2003 | 12/23/2003 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/22/2003 at 5:08:35 PM. Contact: ###-####.c/n posted need 20lb test gas line 12/23/2003 1:38:00 PM
|
Rough-in | 12/19/2003 | 12/22/2003 | 12/22/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/19/2003 at 6:17:39 PM. Contact: ###-####...off 36th..left on sunset 12/22/2003 8:29:42 AM
|
Rough-in | 12/19/2003 | 12/19/2003 | 12/19/2003 | P | CANC |
Dixie Fellows
|
|
|
jeff-- ###-#### out of time...called dale
12/19/2003 4:19:05 PM
|