DOC - Permit Finaled | | | 8/13/2004 | | DONE |
|
|
|
|
Pressure Test | 1/12/2004 | 1/13/2004 | 1/13/2004 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/12/2004 at 1:00:48 PM. Contact: ###-####. 2 supply runs ok as well 1/13/2004 9:28:10 AM
|
Pressure Test | 1/9/2004 | 1/12/2004 | 1/12/2004 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/9/2004 at 1:55:17 PM. Contact: ###-####. bad guage..no duct tape allowed on metal duct...gas line undersized 1/12/2004 9:29:00 AM
|