Final | 5/27/2004 | 5/28/2004 | 5/28/2004 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 5/27/2004 at 10:32:33 AM. Contact: ###-####.
|
Rough-in | 1/29/2004 | 1/30/2004 | 1/30/2004 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 1/29/2004 at 2:08:44 PM. Contact: ###-####.
|
Rough-in | 1/27/2004 | 1/28/2004 | 1/28/2004 | A | FAIL |
Alan Hauser
|
|
|
install fire place flue as manufacture and install with all required clearances and insulation sheild 1/28/2004 10:55:17 AM
|
Rough-in | 1/26/2004 | 1/27/2004 | 1/27/2004 | P | FAIL |
Alan Hauser
|
|
|
need installation guide for downstairs fire place 1/27/2004 3:00:18 PM
|