Final | 3/19/2004 | 3/19/2004 | 3/19/2004 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/19/2004 at 11:04:47 AM. Contact: ###-####.
|
Final | 3/17/2004 | 3/18/2004 | 3/18/2004 | P | CANC |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 3/17/2004 at 3:19:52 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 18 2004 11:24AM.
|
Final | 3/17/2004 | 3/17/2004 | 3/17/2004 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 3/17/2004 at 9:19:56 AM. Contact: ###-####.
|
Pressure Test | 2/3/2004 | 2/3/2004 | 2/3/2004 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/3/2004 at 10:57:26 AM. Contact: ###-####.
|
Pressure Test | 1/30/2004 | 2/2/2004 | 2/2/2004 | A | FAIL |
Alan Hauser
|
|
|
pressure test failed, second time, no inspections till paid 2/2/2004 10:29:57 AM
|
Pressure Test | 2/2/2004 | 2/2/2004 | 2/2/2004 | P | NR |
Jim Storey
|
|
|
###-#### chris not paided. 2/2/2004 2:54:12 PM
|
Pressure Test | 1/29/2004 | 1/30/2004 | 1/30/2004 | A | FAIL |
Alan Hauser
|
|
|
bad gage, wnen line is tested, maybe drop pressure to check gage moves, then set test pressure, thank you 1/30/2004 11:55:57 AM
|
Rough-in | 1/29/2004 | 1/30/2004 | 1/30/2004 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 1/29/2004 at 4:05:40 PM. Contact: ###-####.
|