Final | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PASS |
Dixie Fellows
|
|
|
|
Final | 4/26/2004 | 4/27/2004 | 4/27/2004 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 3:48:46 PM. Contact: ###-####. run secondary drains independent of each other..check gas flex connector sizes for furnaces 4/27/2004 11:03:15 AM
|
Final | 4/14/2004 | 4/14/2004 | 4/14/2004 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/14/2004 at 10:13:19 AM. Contact: ###-####.
|
Rough-in | 4/14/2004 | 4/14/2004 | 4/14/2004 | P | PART |
Dixie Fellows
|
|
|
above ceiling tile drops ok 4/14/2004 3:25:45 PM
|
Rough-in | 4/12/2004 | 4/12/2004 | 4/12/2004 | P | FAIL |
Dixie Fellows
|
|
|
called mark...flex duct to be angled into diffusers per imc 4/12/2004 4:24:37 PM
|
Rough-in | 2/25/2004 | 2/26/2004 | 2/26/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/25/2004 at 8:28:54 AM. Contact: ###-####.
|