Final | 4/21/2004 | 4/22/2004 | 4/22/2004 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|
Final | 4/20/2004 | 4/20/2004 | 4/20/2004 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson supply duct on platform smashed and coming apart..wires in secondary drain pan..secure all supply and r/a diffusers..need engineer to verify what to do about existing duct from hallway that was in the demo plans..the duct is still in place and has a motorized damper in it...talked to journey on site 4/20/2004 1:12:36 PM
|
Rough-in | 3/25/2004 | 3/26/2004 | 3/26/2004 | A | PART |
Dixie Fellows
|
|
|
This is for the west side only. If you have questions please call Gary @ ###-#### Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson WEST WING OK TO COVER 3/26/2004 10:52:17 AM
|
Rough-in | 3/22/2004 | 3/23/2004 | 3/23/2004 | A | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson...terry..###-#### 3/22/2004 9:42:52 AM ok to cover east corner ...will need letter from engineer as duct detectors are to be in supply side per plans 3/23/2004 9:03:29 AM
|
Rough-in | 3/15/2004 | 3/16/2004 | 3/16/2004 | A | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ducts sealed ok 3/16/2004 10:47:15 AM
|