MEC-Aging Inspection | 5/6/2004 | 5/6/2004 | 5/6/2004 | | PASS |
Dixie Fellows
|
|
|
|
Pressure Test | 3/3/2004 | 3/3/2004 | 3/3/2004 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/3/2004 at 7:14:40 AM. Contact: ###-####. 20lb test from main to kit equip ok 3/3/2004 2:40:41 PM
|
Pressure Test | 3/2/2004 | 3/2/2004 | 3/2/2004 | P | NR |
Troy James
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Removed gas line from test to do fire inspection. Told contractor to put test on the gas line and call for reinspection. 3/2/2004 1:36:11 PM
|