Final | 4/16/2004 | 4/20/2004 | 4/20/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/16/2004 at 8:22:28 AM. Contact: ###-####. duplex permit 4/20/2004 2:06:25 PM
|
Pressure Test | 3/11/2004 | 3/12/2004 | 3/12/2004 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/11/2004 at 7:50:18 AM. Contact: ###-####.
|
Rough-in | 3/11/2004 | 3/12/2004 | 3/12/2004 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/11/2004 at 7:49:50 AM. Contact: ###-####.
|