Final | 4/5/2004 | 4/6/2004 | 4/6/2004 | A | PASS |
Dixie Fellows
|
|
|
###-#### 4/5/2004 4:38:52 PM
|
Final | 4/5/2004 | 4/5/2004 | 4/5/2004 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/5/2004 at 10:25:47 AM. Contact: ###-####.
|
Pressure Test | 3/24/2004 | 3/24/2004 | 3/24/2004 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/24/2004 at 6:58:18 AM. Contact: ###-####. 20lb test ok 3/24/2004 1:59:11 PM
|
Pressure Test | 3/23/2004 | 3/23/2004 | 3/23/2004 | P | FAIL |
Dixie Fellows
|
|
|
OFFICE; Phone #: ###-#### Internet Inspection Request from: Darla Downs leaking 3/23/2004 1:27:52 PM
|