Final | 6/8/2004 | 6/9/2004 | 6/9/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/8/2004 at 11:59:07 AM. F/P rough in only......OK. 6/9/2004 12:37:19 PM
|
Final | 3/24/2004 | 3/25/2004 | 3/25/2004 | A | NR |
Dixie Fellows
|
|
|
OFFICE; Phone #: ###-#### Internet Inspection Request from: Darla Downs told megan to finish framing around f/p flue and leave one side open to check for clearances 3/25/2004 8:50:26 AM
|
Final | 3/19/2004 | 3/22/2004 | 3/22/2004 | A | FAIL |
Troy James
|
|
|
Rhonda or Dick; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Provide draft stop at ceiling where flue penetrates. 3/22/2004 10:25:49 AM
|
Rough-in | 3/18/2004 | 3/19/2004 | 3/19/2004 | A | NR |
Dixie Fellows
|
|
|
morgan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...waiting on info on heating journeyman 3/19/2004 3:05:24 PM
|