Final | 6/11/2004 | 6/14/2004 | 6/14/2004 | A | PASS |
Alan Hauser
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Final | 6/10/2004 | 6/11/2004 | 6/11/2004 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/10/2004 at 1:37:46 PM. Contact: ###-####. doors locked 6/11/2004 1:21:27 PM
|
Final | 6/9/2004 | 6/10/2004 | 6/10/2004 | A | FAIL |
Dixie Fellows
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Annette Moore doing floors 6/10/2004 1:41:54 PM
|
Pressure Test | 4/27/2004 | 4/27/2004 | 4/27/2004 | P | PASS |
Dave Hannah
|
|
|
###-#### amy
|
Rough-in | 4/27/2004 | 4/27/2004 | 4/27/2004 | P | PASS |
Dave Hannah
|
|
|
###-#### amy
|
Pressure Test | 4/21/2004 | 4/22/2004 | 4/22/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/21/2004 at 12:26:03 PM. Contact: ###-####. Provide new guage and retest at north gas pipe system. 4/22/2004 9:35:58 AM
|
Rough-in | 4/21/2004 | 4/22/2004 | 4/22/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/21/2004 at 12:25:27 PM. Contact: ###-####.
c/n posted on window. 4/22/2004 9:36:19 AM
|