Final | 5/10/2004 | 5/10/2004 | 5/10/2004 | P | PASS |
Alan Hauser
|
|
|
garage code is 1234; Phone #: ###-#### Internet Inspection Request from: misty evans
|
Final | 5/6/2004 | 5/7/2004 | 5/7/2004 | A | FAIL |
Dixie Fellows
|
|
|
garage code is 1234; Phone #: ###-#### Internet Inspection Request from: misty evans..off vista to malad 5/7/2004 7:41:42 AM need required comb air per ifgc 5/7/2004 11:41:16 AM
|
Rough-in | 3/31/2004 | 3/31/2004 | 3/31/2004 | P | PASS |
Alan Hauser
|
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans
|
Rough-in | 3/30/2004 | 3/30/2004 | 3/30/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/30/2004 at 9:30:04 AM. Contact: ###-####. Still need 1" clearance to b-vent at floor. See stud wall next to b-vent at second level. 3/30/2004 2:35:41 PM
|
Pressure Test | 3/26/2004 | 3/29/2004 | 3/29/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/26/2004 at 1:55:53 PM. Contact: ###-####.
|
Rough-in | 3/26/2004 | 3/29/2004 | 3/29/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/26/2004 at 1:55:46 PM. Contact: ###-####. Provide 1" clearance to b-vent at floor and sheetrock ceiling. Install combustion air within 12" of ceiling per IRC 1703.3. 3/29/2004 9:12:13 AM
|