Final | 6/7/2004 | 6/8/2004 | 6/8/2004 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/7/2004 at 9:36:58 AM. Contact: ###-####.
|
Rough-in | 4/6/2004 | 4/6/2004 | 4/6/2004 | A | PASS |
Alan Hauser
|
|
|
###-#### kirk Scheduled per Alan Hauser
|
Rough-in | 4/2/2004 | 4/5/2004 | 4/5/2004 | A | FAIL |
Alan Hauser
|
|
|
combustion air openings don't meet requirments of 2000 IRC, read chapter 17 and insulation sheilds required at b-vents in attic 2000 IRC G2425.4 4/5/2004 10:11:13 AM
|
Rough-in | 3/29/2004 | 3/30/2004 | 3/30/2004 | P | FAIL |
Alan Hauser
|
|
|
c/n posted inside front window 3/30/2004 3:14:54 PM
|