Final | 5/6/2004 | 5/10/2004 | 5/10/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/6/2004 at 10:35:32 AM.
|
Rough-in | 4/1/2004 | 4/1/2004 | 4/1/2004 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 4/1/2004 at 10:15:30 AM. Contact: ###-####.
|
Pressure Test | 3/30/2004 | 3/30/2004 | 3/30/2004 | P | PASS |
Dave Hannah
|
|
|
###-#### design air
|