Final | 8/17/2004 | 8/18/2004 | 8/18/2004 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 8/17/2004 at 2:34:03 PM. Contact: ###-####.
|
Final | 8/2/2004 | 8/2/2004 | 8/2/2004 | A | FAIL |
Troy James
|
|
|
Need to complete the installation of condensate drain to terminate at floor drain in basement.
|
Pressure Test | 7/30/2004 | 8/2/2004 | 8/2/2004 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/30/2004 at 11:29:30 AM. Contact: ###-####.
|
Rough-in | 7/30/2004 | 8/2/2004 | 8/2/2004 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/30/2004 at 11:30:07 AM. Contact: ###-####.
|
Pressure Test | 5/5/2004 | 5/5/2004 | 5/5/2004 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 5/5/2004 at 9:32:57 AM. Contact: ###-####.
|
Rough-in | 5/5/2004 | 5/5/2004 | 5/5/2004 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 5/5/2004 at 9:32:34 AM. Contact: ###-####.
|