Rough-in | 5/13/2004 | 5/14/2004 | 5/14/2004 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England
|
Rough-in | 5/12/2004 | 5/13/2004 | 5/13/2004 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/12/2004 at 1:41:39 PM. Contact: ###-####. corrections not done...42.10 fee 5/12/2004 3:31:01 PM
|
Pressure Test | 5/11/2004 | 5/12/2004 | 5/12/2004 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England whole line wasnt on test 5/12/2004 9:45:49 AM
|
Pressure Test | 5/12/2004 | 5/12/2004 | 5/12/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/12/2004 at 10:38:34 AM. Contact: ###-####.
|
Rough-in | 5/11/2004 | 5/12/2004 | 5/12/2004 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England need 1" clear from b-vent to flex..isolate r/a from b-vent in chase 5/12/2004 9:45:37 AM
|