Final | 7/8/2004 | 7/9/2004 | 7/9/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/8/2004 at 4:51:12 PM. Contact: ###-####.
|
Pressure Test | 5/11/2004 | 5/12/2004 | 5/12/2004 | A | PASS |
Troy James
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Rough-in | 5/11/2004 | 5/12/2004 | 5/12/2004 | A | PASS |
Troy James
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|