Final | 10/6/2005 | 10/6/2005 | 10/6/2005 | P | PASS |
Dixie Fellows
|
|
|
per your request
|
Final | 10/5/2005 | 10/5/2005 | 10/5/2005 | A | NR |
Dixie Fellows
|
|
|
per your request..i need to see final venting and connections at pool heaters
|
Final | 9/30/2005 | 9/30/2005 | 9/30/2005 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/30/2005 at 7:08:47 AM. Contact: ###-####...i will final this when all heating and connections are made
|
Pressure Test | 5/4/2005 | 5/5/2005 | 5/5/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/4/2005 at 1:39:45 PM. Contact: ###-####...60lb u/g test to future generator ok....60lb u/g test to pool heater ok
|
Pressure Test | 12/7/2004 | 12/7/2004 | 12/7/2004 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/7/2004 at 7:13:56 AM. Contact: ###-####.
|
Conference | 5/18/2004 | 5/19/2004 | 5/19/2004 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 5/18/2004 at 2:47:26 PM. Contact: ###-####.
|