Final | 8/12/2004 | 8/12/2004 | 8/12/2004 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 8/12/2004 at 7:34:42 AM. Contact: ###-####.
|
Rough-in | 6/24/2004 | 6/24/2004 | 6/24/2004 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 6/22/2004 | 6/22/2004 | 6/22/2004 | P | FAIL |
Alan Hauser
|
|
|
flex flue is bent passed 45 degrees, as required by manufacture 6/22/2004 12:15:51 PM
|