Final | 8/18/2004 | 8/18/2004 | 8/18/2004 | P | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 8/18/2004 at 11:09:14 AM. Contact: ###-####.
|
Rough-in | 6/23/2004 | 6/24/2004 | 6/24/2004 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/23/2004 at 3:40:38 PM. Contact: ###-####.
|
Pressure Test | 6/21/2004 | 6/22/2004 | 6/22/2004 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/21/2004 at 12:29:35 PM. Contact: ###-####.
|
Rough-in | 6/21/2004 | 6/22/2004 | 6/22/2004 | A | FAIL |
Alan Hauser
|
|
|
insulate metal at attic as 2000 irc, m1901.3.4#1 6/22/2004 12:16:41 PM
|