Rough-in | 9/7/2004 | 9/7/2004 | 9/7/2004 | P | PASS |
Dixie Fellows
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles CORRECTION ON ATTIC FURNACE DONE 9/7/2004 4:01:46 PM
|
Final | 9/1/2004 | 9/2/2004 | 9/2/2004 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/1/2004 at 2:53:04 PM. Contact: ###-####. not installed yet... 9/2/2004 11:12:25 AM
|
Final | 7/13/2004 | 7/14/2004 | 7/14/2004 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/13/2004 at 8:42:09 AM. Contact: ###-####. need 30" working space in front of furnace in attic 7/14/2004 3:50:46 PM
|