Final | 9/28/2004 | 9/28/2004 | 9/28/2004 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/28/2004 at 8:32:04 AM. Contact: ###-####.
|
Rough-in | 7/13/2004 | 7/13/2004 | 7/13/2004 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 7/13/2004 at 5:41:46 AM. Contact: ###-####.
|
Rough-in | 7/8/2004 | 7/8/2004 | 7/8/2004 | A | FAIL |
Alan Hauser
|
|
|
finish framing at 2nd flr. flue 7/8/2004 11:36:46 AM
|