Final | 9/15/2004 | 9/16/2004 | 9/16/2004 | P | PASS |
Dixie Fellows
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Conference | 9/14/2004 | 9/14/2004 | 9/14/2004 | P | DONE |
Lane Manuel
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
met w/ owner and contr. to discuss issues. noted a few correction items. 9/14/2004 1:51:13 PM
|
Final | 9/9/2004 | 9/10/2004 | 9/10/2004 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/9/2004 at 3:48:27 PM. Contact: ###-####. temp occ ok ..waiting on type 2 hood 9/10/2004 9:51:54 AM
|
Final | 9/8/2004 | 9/9/2004 | 9/9/2004 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/8/2004 at 3:30:38 PM. Contact: ###-####. called martha 9/9/2004 9:31:23 AM
|
Final | 9/9/2004 | 9/9/2004 | 9/9/2004 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/9/2004 at 9:31:45 AM. Contact: ###-####.
|
Final | 9/7/2004 | 9/8/2004 | 9/8/2004 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/7/2004 at 2:07:25 PM. Contact: ###-####.
|
Pressure Test | 9/7/2004 | 9/8/2004 | 9/8/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/7/2004 at 2:06:57 PM. Contact: ###-####. hp test ok 60 # 9/8/2004 10:05:58 AM
|
Final | 9/3/2004 | 9/3/2004 | 9/3/2004 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/3/2004 at 9:06:44 AM. Contact: ###-####. had a conference on wrapping the top of hood and grease duct 9/3/2004 3:05:45 PM
|
Conference | 9/1/2004 | 9/1/2004 | 9/1/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/1/2004 at 9:41:24 AM. Contact: ###-####. met with george, alan, bill graham regarding clearances in shaft to grease duct..bill showed us the revised plan and we advised him he would still need to meet the minimum code requirements 9/1/2004 1:50:46 PM
|
Conference | 8/30/2004 | 8/30/2004 | 8/30/2004 | P | PART |
Tom Arcoraci
|
|
|
Please meet Dixie at 1:15pm needs to provide correct clear at hood 8/30/2004 1:57:41 PM
|
Rough-in | 8/30/2004 | 8/30/2004 | 8/30/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/30/2004 at 10:14:49 AM. Contact: ###-####. MET WITH TOM AND BILL AND DISCUSSED CORRECTION NOTICE AND LETTER FROM BILL CARTER 8/30/2004 4:57:45 PM
|
Rough-in | 8/24/2004 | 8/25/2004 | 8/25/2004 | A | FAIL |
Dixie Fellows
|
|
|
###-#### posted corrections on front door 8/25/2004 9:24:00 AM
|
Final | 8/23/2004 | 8/24/2004 | 8/24/2004 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/23/2004 at 1:42:15 PM. Contact: ###-####.
|
Rough-in | 7/13/2004 | 7/14/2004 | 7/14/2004 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/13/2004 at 8:38:43 AM. Contact: ###-####. not ready for r/i;..discussed shaft, clearances and engineering on hood 7/14/2004 11:48:32 AM
|